3-Axis Cartesian Robot Demoulding Take-Out Time Formula

Calculates the mould-open time consumed by a high-speed top-entry Cartesian servo robot entering the mould space, gripping parts with end-of-arm tooling (EOAT), stripping from ejector pins, and exiting to safe clearance.

Mathematical Canonical Relation
ttakeout=tenter+tgrip+tstrip+texitt_{takeout} = t_{enter} + t_{grip} + t_{strip} + t_{exit}
Plain Formula: t_takeout = t_enter + t_grip + t_strip + t_exit

Live Engineering Parameter Solver

Input your production or test values below for instant, verified output.

Verified Engine
t_in
Range: 0.1 – 2 s
t_vac
Range: 0.05 – 0.8 s
t_ext
Range: 0.05 – 1 s
t_out
Range: 0.1 – 2 s
Calculated Engineering Result:
t_takeout = 0.95 seconds
Engineering Verification:Mould open time delay added to cycle.

When & Where to Apply

Use when calculating injection moulding overall cycle time and maximizing machine throughput in high-cavity packaging and medical moulding lines.

Common Engineering Pitfalls

  • Assuming robot cycle time equals total machine cycle time (robot runs in parallel with cooling while mould is closed)
  • Forgetting that only the mould-open portion (take-out time) directly increases overall cycle time

Physical Assumptions & Validity Limits

  • Full servo acceleration and deceleration trajectories with S-curve smoothing
  • Vacuum switch confirmation feedback time is included in t_grip
  • Mould opening stroke is sufficient for EOAT clearance

Variable Symbols, SI Units & Dimensional Specifications

SymbolVariable MeaningSI UnitTypical Industrial Range
t_{takeout}Total mould open take-out delayseconds—
t_{enter}Robot vertical axis entry time into cavityseconds0.45
t_{grip}Vacuum suction cup build & sensor confirmationseconds0.15
t_{strip}Ejector stroke forward & part extractionseconds0.25
t_{exit}Robot ascent out of mould to safe clearanceseconds0.45

Worked Industrial Numerical Example: High-Speed 32-Cavity Bottle Cap Demoulding Robot

Problem Statement:

A 32-cavity beverage closure mould uses a high-speed side-entry servo robot. Entry time = 0.35 s, vacuum grip = 0.10 s, ejector assist strip = 0.15 s, exit time = 0.35 s. Calculate total take-out time and percentage of 5.5 s overall cycle.

Step-by-Step Numerical Solution:
  1. Sum take-out components: 0.35 + 0.10 + 0.15 + 0.35 = 0.95 seconds
  2. Calculate cycle fraction: (0.95 / 5.5) * 100 = 17.27%
Final Answer: t_takeout = 0.95 seconds (17.3% of cycle)
💡 Engineering Interpretation: The robot take-out time is under 1.0 second, allowing a fast 5.5 second overall cycle yielding over 20,900 caps per hour from a single 32-cavity mould.

Authoritative Technical Reference & Source Provenance

Robotics and Automation in the Plastics Industry by Christian Hopmann (Hanser, 2018), 1st Edition, Page 45-52.
Connected Curriculum Lesson

Cartesian & 6-Axis Articulated Robots for Demoulding & Degating

Study Full Lesson